PERMALIGHT® PROJECT SERVICE |HOSPITALS / NURSING HOMES

Delivery and installation of a safety guidance system for a nurses’ dormitory.

  • Project details
  • Nurses’ dormitory
  • 11 floors, 2 staircases
  • Illumination: Fluorescent tubes between 50 and 450 lux, partially day light

  • Coordination with the client
  • Survey
  • Planning of quantities
  • Creating an installation drawing
  • Iue of an estimate
  • Delivery safety guidance system
    • Aluminium guidance strips with Arlon adhesive (approximately 1.100 wall
    • Aluminium grating markers (floor and stairs)
    • Polycarbonate floor markings
    • Door latch
    • Push – Pull stickers for doors
    • Signage (floor ID, egress signage and prohibition signage)
  • Installation
  • Documentation (as fitted as)

August 2008

  • The contact clients contacts Permalight by phone (Klink Service GmbH, Dept. for safety)
  • The client receives samples

September 2008

  • Consultation on site
  • Product presentation to the client

December 2009

  • First survey
  • Quantity counts
  • Creation of sample documentation for one floor including detailed drawing

December through March 2009

  • Comparison of an estimate for electrical safety guidance products (approximately EUR 100,000) and the estimate for a photoluminescent safety guidance system (approximately EUR 40,000) and negotiations

July 2009

  • The client awards Permalight
  • Installation

August 2009

  • Remaining installation